A Guide to Below Hook Devices for Jobsite Use

A Guide to Below Hook Devices for Jobsite Use

A guide to below hook devices starts where the lift actually happens: between the crane hook and the load. This equipment may look straightforward, but it carries the full consequence of a bad fit, an undocumented repair, or a missed inspection. When an inspector asks...
Contractor Load Testing Support That Keeps Jobs Moving

Contractor Load Testing Support That Keeps Jobs Moving

A failed inspection can hold up a pick, delay turnover, and leave a crew waiting on paperwork instead of working. Contractor load testing support is about preventing that situation: getting lifting-related equipment proof tested, documented, and ready for approval...
How to Prepare for Load Certification at Your Site

How to Prepare for Load Certification at Your Site

An inspector is scheduled, a lift is waiting, and the paperwork is not ready. That is when project schedules start slipping. Knowing how to prepare for load certification before the testing crew arrives keeps the process focused, documented, and on track. Proof load...
Guide to Lifting Device Approval on Active Jobsites

Guide to Lifting Device Approval on Active Jobsites

A lifting device can be ready to pick a load and still fail the approval process. The missing piece is often not the hardware. It is the proof load test, current inspection status, traceable records, or documentation an inspector needs before allowing the lift to...
Can Inspectors Reject Missing Documentation?

Can Inspectors Reject Missing Documentation?

A lift can be properly planned, the equipment can look serviceable, and the crew can be ready to work – but the job can still stop when the inspector asks for records that are not available. Can inspectors reject missing documentation? In many cases, yes. If...
Best Practices for Proof Testing on Jobsites

Best Practices for Proof Testing on Jobsites

A failed inspection is rarely caused by one missing signature. More often, it starts days earlier with unclear equipment identification, an assumed test load, or a test plan that was never reviewed with the people doing the work. Following best practices for proof...
What Documents Do Inspectors Require on Site?

What Documents Do Inspectors Require on Site?

An inspector is standing at the gate, a lift is scheduled, and the crew is waiting. The question is not whether the equipment was tested at some point. It is: what documents do inspectors require to approve it for use right now? For lifting equipment, rigging...
Load Test vs Visual Check: What Inspectors Need

Load Test vs Visual Check: What Inspectors Need

A load test vs visual check is not an either-or decision when a lift, rigging assembly, or lifting device must pass inspection. A visual inspection can identify obvious damage and missing components. A documented proof load test demonstrates that equipment has...
How Often Should You Test Lifting Equipment?

How Often Should You Test Lifting Equipment?

A failed inspection can stop a lift before the crew gets started. The practical answer to how often to test lifting equipment is that there is no single interval for every sling, hoist, lifting beam, shackle, crane attachment, or rigging assembly. Inspection...
Mobile Testing Versus Shop Testing

Mobile Testing Versus Shop Testing

A failed inspection rarely happens at a convenient time. When a crane attachment, lifting beam, spreader bar, or rigging component needs proof load testing, the real question is not just whether it can be certified – it is how fast you can get that certification...